Modernizing a 19-year-old ERP without replacing it
A precision components manufacturer was quoting from costs that were months out of date. Rather than a replacement program, we modernized incrementally around the existing system.
- Inventory accuracy, up from 82%
- 97.8%Inventory accuracy, up from 82%
- Job costing, previously four to six weeks
- Same dayJob costing, previously four to six weeks
- Gross margin after quote model correction
- +6.4 ptsGross margin after quote model correction
- Unplanned production stoppages during rollout
- 0Unplanned production stoppages during rollout